Looking Back at the History
An overview of the first seven project weeks: from establishing the working foundation to the first significant implementation wave.
Summary for Non-Technical Readers
In the available history, the project is moving in the right direction. First, the team safely brought the original system into the repository. Then it cleaned up documentation and knowledge. Next, the first concrete analytical materials and proofs of concept appeared. Finally, the work shifted into the first stronger implementation steps.
In other words: this is not just a collection of old files. There is a visible progression from inventory, through understanding, to initial execution.
Basis of the Summary
This summary is based on a local mirror of the NEO_HEF repository and the output of git log --all. The available history contains 313 commits in the interval from 2026-03-12 to 2026-04-25. Statistics are calculated across all refs, so they include merge commits and branch work, not only the clean story of the develop branch.
Quick Numbers
- History covered: the first
7project weeks - Observed period:
March 12, 2026toApril 25, 2026 - Most active authors:
Holý Petr (162),Jan Krejčí (81),Kupec Alexandr (37),Bacovský Martin (24),Michaela Žočková (7)
Weeks
| Week | Date | Commits | Main Line | Detail |
|---|---|---|---|---|
Week One |
March 9, 2026 - March 15, 2026 |
21 | working migration foundation is created | week detail |
Week Two |
March 16, 2026 - March 22, 2026 |
55 | the system starts to form one picture | week detail |
Week Three |
March 23, 2026 - March 29, 2026 |
18 | documentation starts getting organized | week detail |
Week Four |
March 30, 2026 - April 5, 2026 |
24 | the archive becomes a migration lab | week detail |
Week Five |
April 6, 2026 - April 12, 2026 |
44 | deeper analyses and first PoCs appear | week detail |
Week Six |
April 13, 2026 - April 19, 2026 |
46 | the plan turns into the first runnable steps | week detail |
Week Seven |
April 20, 2026 - April 26, 2026 |
100 | the first implementation wave takes shape | week detail |
Main Development Line
So far, NEO_HEF has evolved in four clear waves. First came the import of legacy sources and reference trees. Then cleanup and the creation of the documentation and BMAD layer. After that, more detailed code dissection, prompt engineering, and printing PoCs. Finally, the project entered the first significant implementation wave around RZP, SPOL, SPK, the launcher, login, audit, locking, and fenCRep compatibility.
The weekly detail is split into separate posts so the blog can keep growing without turning one article into an unreadable long document.