Summary for Non-Technical Readers

In the available history, the project is moving in the right direction. First, the team safely brought the original system into the repository. Then it cleaned up documentation and knowledge. Next, the first concrete analytical materials and proofs of concept appeared. Finally, the work shifted into the first stronger implementation steps.

In other words: this is not just a collection of old files. There is a visible progression from inventory, through understanding, to initial execution.

Basis of the Summary

This summary is based on a local mirror of the NEO_HEF repository and the output of git log --all. The available history contains 313 commits in the interval from 2026-03-12 to 2026-04-25. Statistics are calculated across all refs, so they include merge commits and branch work, not only the clean story of the develop branch.

Quick Numbers

  • History covered: the first 7 project weeks
  • Observed period: March 12, 2026 to April 25, 2026
  • Most active authors: Holý Petr (162), Jan Krejčí (81), Kupec Alexandr (37), Bacovský Martin (24), Michaela Žočková (7)

Weeks

Week Date Commits Main Line Detail
Week One March 9, 2026 - March 15, 2026 21 working migration foundation is created week detail
Week Two March 16, 2026 - March 22, 2026 55 the system starts to form one picture week detail
Week Three March 23, 2026 - March 29, 2026 18 documentation starts getting organized week detail
Week Four March 30, 2026 - April 5, 2026 24 the archive becomes a migration lab week detail
Week Five April 6, 2026 - April 12, 2026 44 deeper analyses and first PoCs appear week detail
Week Six April 13, 2026 - April 19, 2026 46 the plan turns into the first runnable steps week detail
Week Seven April 20, 2026 - April 26, 2026 100 the first implementation wave takes shape week detail

Main Development Line

So far, NEO_HEF has evolved in four clear waves. First came the import of legacy sources and reference trees. Then cleanup and the creation of the documentation and BMAD layer. After that, more detailed code dissection, prompt engineering, and printing PoCs. Finally, the project entered the first significant implementation wave around RZP, SPOL, SPK, the launcher, login, audit, locking, and fenCRep compatibility.

The weekly detail is split into separate posts so the blog can keep growing without turning one article into an unreadable long document.