Summary for Non-Technical Readers

Week seven is the first truly visible implementation wave. The project moves from plans and PoCs toward giving the new application shared building blocks: startup, login, database work, locking, audit, and the first outline of shared reporting.

For management, the important point is that these are not isolated experiments. Individual parts are starting to fit into a common skeleton that specific modules can build on.

What Happened

The week's history mainly shows acceleration around the shared SPOL and SPK layers and their connection to RZP. Steps such as SPOL/SPK step 00, step 01/08, SPK-S04, SPK-S05, SPK-S06, and related parts of the implementation sequence are completed or reviewed. Formal sign-off of some steps, ongoing code review, and documentation refinement are added as well.

In parallel, the team works on practical runnability. The launcher moves into the source tree, scripts for launching the launcher and RZP are created, startup against MDB is fixed, SPOL tests are moved from RZP into the proper layer, and user-facing WinForms details such as titles, diacritics, status bar, and icon are tuned.

There is also a significant shift in shared infrastructure. The login panel and login-form responsibilities appear, the old Oracle provider is removed, and infrastructure emerges for DB authentication, transactional locking, registry-only configuration with lazy write-back, and the audit lifecycle service. At the same time, fenCRep compatibility work moves into SPOL, forming the future shared layer for Crystal Reports.

Week seven is therefore not just "we started writing code." It is the week when the common foundation of the new application starts to take shape: it can start, log in, work with the database, behave auditable, and gradually take over problematic areas such as print reports.